We accept Apple Pay Google Pay & 3 interest-free instalments via Klarna · 0330 124 2165
Workplace Safety & Risk

Plan, Do, Check, Act: HSE’s HSG65 Model for Managing Health and Safety

Plan, Do, Check, Act is how HSE's HSG65 says health and safety should be managed. Here is each stage in practice, with a construction example.

Published 6 October 2026 4 min read
Health and safety manager presenting a four-step cycle diagram to a management team

Plan, Do, Check, Act is a simple cycle for managing anything well, and HSE uses it as the basis of its guidance HSG65, Managing for health and safety. It replaces the idea of health and safety as a set of documents with a continuous loop: decide what you want, do it, check it worked, and learn from the results.

The four stages at a glance

StageWhat HSG65 says you should doIn practice
PlanDetermine your policy and plan for implementationWrite a health and safety policy, set objectives, decide how you will measure performance and plan for change and emergencies.
DoProfile your health and safety risks, organise for health and safety, and implement your planAssess risks, involve workers, provide training and resources, put controls in place.
CheckMeasure performance, both active and reactive, and investigate accidents and incidentsInspections, audits, monitoring, accident and near miss investigation.
ActReview performance and act on lessons learnedManagement reviews, updating the plan and acting on what monitoring showed.

Organising: the four Cs

In the Do stage, HSG65 describes good organisation in terms of four Cs:

  • Competence: recruitment, training and advice so people can do their jobs safely
  • Control: clear responsibilities, leadership and supervision
  • Cooperation: involving workers and their representatives
  • Communication: visible behaviour, written material and face-to-face discussion

Active and reactive monitoring

TypeWhat it isExamples
Active monitoringChecking that controls are in place before something goes wrongSite inspections, audits, scaffold inspections, checking RAMS are followed, health surveillance
Reactive monitoringLearning from things that have gone wrongAccident and near miss reports, ill health records, RIDDOR reports, complaints

Good monitoring uses both. A site that only measures accidents finds out about problems after people are hurt.

A construction site example

StageExample: managing work at height on a housing site
PlanThe construction phase plan sets rules for work at height, the programme allows time for edge protection, and the target is zero falls.
DoScaffolds are designed and erected by competent scaffolders, operatives are trained, and supervisors brief teams in toolbox talks.
CheckWeekly scaffold inspections, daily supervisor checks and a monthly audit. A near miss with a missing guard rail is investigated.
ActThe review finds guard rails are removed for deliveries. The delivery procedure is changed and loading bays are added.

PDCA, POPMAR and ISO 45001

Older editions of HSG65 used the POPMAR model: policy, organising, planning, measuring performance, audit and review. The 2013 edition moved to Plan, Do, Check, Act, which says much the same in a simpler way. The international standard for health and safety management systems, ISO 45001, is also built on Plan, Do, Check, Act, so a business following HSG65 is well placed to work towards certification.

Where the law fits in

The Management of Health and Safety at Work Regulations 1999 require employers to have arrangements for the effective planning, organisation, control, monitoring and review of preventive measures. Plan, Do, Check, Act is a practical way to meet that duty. Our guide to the Management Regulations explains the duties, and our guide on how to write a health and safety policy covers the Plan stage.

Training that helps

Managing health and safety with Plan, Do, Check, Act is at the heart of IOSH Managing Safely and the NEBOSH National General Certificate. Our health and safety for managers eLearning is a quick online introduction.

Where this fits in SMSTS and SSSTS

The SSSTS paper asks you to name the missing stages of the Plan, Do, Check, Act cycle, and management systems are tested on SMSTS too. Our free SMSTS mock test and SSSTS mock test let you check your knowledge before the course or a refresher, and you can email yourself the results sheet at the end.

When you are ready, the five day SMSTS course is for site managers and the two day SSSTS course is for supervisors. If your certificate is due, the SMSTS refresher and SSSTS refresher keep it current.

Frequently asked questions

What is Plan, Do, Check, Act in health and safety?

A four-stage cycle for managing health and safety, used in HSE’s guidance HSG65: plan what you will do, do it, check it worked and act on what you learn.

What is HSG65?

HSE’s guidance Managing for health and safety, which sets out how organisations should manage health and safety using Plan, Do, Check, Act.

What is the difference between active and reactive monitoring?

Active monitoring checks controls are working before anything goes wrong. Reactive monitoring learns from accidents, incidents and ill health after they happen.

What does POPMAR stand for?

Policy, organising, planning, measuring performance, audit and review. It was the model used in earlier editions of HSG65.

Read the source

HSE guidance HSG65, Managing for health and safety (third edition, 2013); the Management of Health and Safety at Work Regulations 1999, regulation 5; and ISO 45001:2018, Occupational health and safety management systems. Facts checked on 6 October 2026.

When can we do it

Find a date that works

Every course, every centre, with live availability and prices.

On your site or ours, and group rates on request.

Tell us what the job is and who is doing it, and we will point you at the right thing rather than the dearest thing.
Skip to main content