Level 6 NVQ Diploma in Construction Contracting Operations Management

Get In Touch

Do you want to get in touch with us? Please, send your email to hello@acadame.co.uk

OR
Terms & Conditions

In the event of a cancellation or deferment, we provide fully transparent terms and conditions.

This qualification is aimed at those who are involved in the Management of Construction Contracting Operations.

Complete on-the-job, at your own pace (Self-paced)

  • £1,445.00 excl. VAT

Description

It is not expected that candidates working in this role have the same responsibilities or requirements so the qualification has a number of pathways to suit a wide range of activities. This qualification is at Level 6, although some units may be at different levels and is primarily aimed at those already carrying out managerial responsibilities. The qualification is structured to ensure that there is a high degree of flexibility within the pathways and units available and will allow employees from companies of all sizes and specialisms equal opportunity to complete.

Qualification Breakdown

The qualification consists of 4 mandatory units with a credit value of 31 credits, candidates must also achieve the required credits from the selected pathway.

Mandatory Units

  • Maintain health, safety and welfare systems in construction contracting operations management (10)
  • Chair meetings and take decisions in construction contracting operations management (8)
  • Develop and maintain working relationships and personal development in construction contracting operations management (8)
  • Plan, allocate and monitor work of a team in own area of responsibility (5)

Pathway 1

General (minimum 50 credits required):

  • Plan measured surveys in construction contracting operations management (14)
  • Establish the condition of property in construction contracting operations management (14)
  • Identify, assess and evaluate project requirements in construction contracting operations management (18)
  • Develop and agree detailed project designs in construction contracting operations management (20)
  • Specify and control production documents in construction contracting operations management (18)
  • Prepare procurement schedules and programmes of works in construction contracting operations management (16)
  • Implement strategic and integrated supply chain management and sourcing partnerships in construction contracting operations management (20)
  • Obtain tenders and appoint successful contractors in construction contracting operations management (12)
  • Evaluate enquiries and submit tenders in construction contracting operations management (12)
  • Evaluate work methods and programme in construction contracting operations management (13)
  • Analyse, monitor and optimise materials, plant and services in construction contracting operations management (13)
  • Control contract work in construction contracting operations management (13)
  • Optimise and control contract progress and costs in construction contracting operations management (13)
  • Prepare and agree contract accounts and entitlement in construction contracting operations management (14)

Pathway 2

Estimating Pathway Mandatory Units:

  • Identify, assess and evaluate project requirements in construction contracting operations management (18)
  • Develop and agree detailed project designs in construction contracting operations management (20)
  • Specify and control production documents in construction contracting operations management (18)
  • Prepare procurement schedules and programmes of works in construction contracting operations management (16)
  • Implement strategic and integrated supply chain management and sourcing partnerships in construction contracting operations management (20)
  • Obtain tenders and appoint successful contractors in construction contracting operations management (12)
  • Evaluate enquiries and submit tenders in construction contracting operations management (12)
  • Evaluate work methods and programme in construction contracting operations management (13)
  • Analyse, monitor and optimise materials, plant and services in construction contracting operations management (13)
  • Control contract work in construction contracting operations management (13)
  • Optimise and control contract progress and costs in construction contracting operations management (13)
  • Prepare and agree contract accounts and entitlement in construction contracting operations management (14)
  • Identify, assess and evaluate project requirements in construction contracting operations management (18)
  • Obtain tenders and appoint successful contractors in construction contracting operations management (12)
  • Evaluate enquiries and submit tenders in construction contracting operations management (12)

 

Optional Units (minimum 12 credits):

  • Plan measured surveys in construction contracting operations management (14)
  • Establish the condition of property in construction contracting operations management (14)
  • Develop and agree detailed project designs in construction contracting operations management (20)
  • Specify and control production documents in construction contracting operations management (18)
  • Prepare procurement schedules and programmes of works in construction contracting operations management (16)
  • Implement strategic and integrated supply chain management and sourcing partnerships in construction contracting operations management (20)
  • Evaluate work methods and programme in construction contracting operations management (13)
  • Control contract work in construction contracting operations management (13)
  • Optimise and control contract progress and costs in construction contracting operations management (13)
  • Prepare and agree contract accounts and entitlement in construction contracting operations management (14)
  • Analyse, monitor and optimise materials, plant and services in construction contracting operations management (13)

Pathway 3

Buying Mandatory Units:

  • Identify, assess and evaluate project requirements in construction contracting operations management (18)
  • Implement strategic and integrated supply chain management and sourcing partnerships in construction contracting operations management (20)
  • Analyse, monitor and optimise materials, plant and services in construction contracting operations management (13)

 

Optional Units (minimum 12 credits):

  • Plan measured surveys in construction contracting operations management (14)
  • Establish the condition of property in construction contracting operations management (14)
  • Develop and agree detailed project designs in construction contracting operations management (20)
  • Specify and control production documents in construction contracting operations management (18)
  • Prepare procurement schedules and programmes of works in construction contracting operations management (16)
  • Evaluate enquiries and submit tenders in construction contracting operations management (12)
  • Evaluate work methods and programme in construction contracting operations management (13)
  • Control contract work in construction contracting operations management (13)
  • Optimise and control contract progress and costs in construction contracting operations management (13)
  • Prepare and agree contract accounts and entitlement in construction contracting operations management (14)
  • Obtain tenders and appoint successful contractors in construction contracting operations management (12)

Pathway 4

Planning Mandatory Units:

  • Identify, assess and evaluate project requirements in construction contracting operations management (18)
  • Evaluate work methods and programme in construction contracting operations management (13)
  • Prepare procurement schedules and programmes of works in construction contracting operations management (16)

 

Optional Units (minimum 12 credits):

  • Plan measured surveys in construction contracting operations management (14)
  • Establish the condition of property in construction contracting operations management (14)
  • Develop and agree detailed project designs in construction contracting operations management (20)
  • Specify and control production documents in construction contracting operations management (18)
  • Analyse, monitor and optimise materials, plant and services in construction contracting operations management (13)
  • Evaluate enquiries and submit tenders in construction contracting operations management (12)
  • Control contract work in construction contracting operations management (13)
  • Optimise and control contract progress and costs in construction contracting operations management (13)
  • Prepare and agree contract accounts and entitlement in construction contracting operations management (14)
  • Obtain tenders and appoint successful contractors in construction contracting operations management (12)
  • Implement strategic and integrated supply chain management and sourcing partnerships in construction contracting operations management (20

Pathway 5

Quantity Surveying Mandatory Units:

  • Specify and control production documents in construction contracting operations management (18)
  • Optimise and control contract progress and costs in construction contracting operations management (13)
  • Prepare and agree contract accounts and entitlement in construction contracting operations management (14)

 

Optional Units (minimum 12 credits):

  • Plan measured surveys in construction contracting operations management (14)
  • Establish the condition of property in construction contracting operations management (14)
  • Identify, assess and evaluate project requirements in construction contracting operations management (18)
  • Develop and agree detailed project designs in construction contracting operations management (20)
  • Prepare procurement schedules and programmes of works in construction contracting operations management (16)
  • Implement strategic and integrated supply chain management and sourcing partnerships in construction contracting operations management (20)
  • Obtain tenders and appoint successful contractors in construction contracting operations management (12)

Assessment

  • Portfolio of Evidence